UL 508A • CSA C22.2 • SCADA Ready

Process Control Panels

SCADA-integrated process control panels with field I/O, telemetry, and remote monitoring for water treatment, oil & gas, and industrial process applications.

SCADA IntegrationField I/OTelemetry ReadyUL 508A
UL 508A
Standard
SCADA Ready
Integration
4–20 mA / RTD
Field I/O
RTU / PLC
Controller
Same-Day Quotes
Price and lead time today
2-Year Warranty
Backed by our engineering team
North America Made
Built in Toronto, Ontario
Overview

Field Intelligence for Remote Process Monitoring

Process control panels bring the field instruments into the control room — or closer to the process — with a local RTU or PLC, analog I/O modules, and SCADA communication. Designed for unmanned remote stations, pumping stations, and process plants where reliability and remote diagnostics are critical.

  • Remote terminal unit (RTU) or PLC with local HMI display
  • Analog input cards: 4–20 mA, RTD (Pt100/Pt1000), thermocouple
  • Digital I/O for valve feedback, alarm, and field device status
  • SCADA communication: Modbus TCP/RTU, DNP3, IEC 60870-5
  • UPS and battery backup for power interruption ride-through
  • Environmental rating: NEMA 4X for outdoor, corrosive, or washdown
Process Control Panels
Control Panels
UL 508A • CSA C22.2 • SCADA Ready
Features & Upgrades

What's Included

Standard Features
  • RTU or PLC with analog and digital I/O modules
  • 4–20 mA signal conditioning and terminal strips
  • RTD/TC input cards for temperature monitoring
  • Intrinsically safe (IS) barriers for hazardous area field devices
  • Fused terminal blocks per instrument loop
  • SCADA communication card (Modbus, DNP3, IEC 60870)
  • Panel-mounted HMI display (optional) for local monitoring
  • UPS module: 30 min to 8 hr battery backup
  • Heater and thermostat for outdoor panels in cold climates
Optional Upgrades
  • +Cellular / satellite modem for remote sites (no LAN connectivity)
  • +IEC 62443-compliant cybersecurity hardening
  • +Fiber optic media converter for long-distance communication
  • +Redundant RTU or PLC CPU for critical process stations
  • +Surge protection on all analog and digital field cables
  • +Live digital twin integration with asset management platform
  • +Cloud historian integration (OPC-UA to Azure / AWS IoT)
  • +Witnessed factory acceptance testing (FAT) with SCADA host
Technical Specifications

Full Specifications

ParameterValue
Controller TypeRTU (SEL, Schneider), PLC (Allen-Bradley, Siemens, Omron)
Analog Inputs4–20 mA (source/sink), 0–10 V, RTD (2/3/4-wire), TC (J/K/T/E)
Analog Outputs4–20 mA control signals to positioners and drives
Digital I/OWet/dry contact DI, relay/transistor DO
SCADA ProtocolModbus TCP/RTU, DNP3, IEC 60870-5-101/104, OPC-UA
Communication MediaEthernet, RS-485, fibre optic, cellular (4G LTE / 5G)
Power Supply120/240 VAC input; 24 VDC output with UPS battery backup
EnclosureNEMA 4X (stainless) standard for outdoor; NEMA 12 for indoor
Hazardous AreaClass I, Div 2 (Zone 2) with IS barriers or Ex-rated components
StandardUL 508A, CSA C22.2 No. 14, CSA C22.2 No. 213 (Class I Div 2)
Lead Time5–10 weeks from approved I/O list
Standards & Compliance

Built to Standard

UL 508A
Industrial control panel standard for process control assemblies
CSA C22.2 No. 14
CSA C22.2 No. 14
Canadian industrial control equipment standard
IEC 62443
IEC 62443
Industrial cybersecurity framework for IACS — applied to SCADA-connected panels
IEC 60870-5
IEC 60870-5
Telecontrol protocol for SCADA communication in utility and infrastructure
CSA C22.2 No. 213
CSA C22.2 No. 213
Canadian standard for Class I, Div 2 hazardous area installations
NETA ATS
NETA ATS
Acceptance testing specifications for I/O verification and commissioning
Applications

Where It's Used

  • Municipal water and wastewater pumping stations
  • Oil & gas pipeline SCADA remote terminal units
  • Stormwater lift station monitoring and control
  • District energy heat pump and chiller plant control
  • Landfill gas monitoring and extraction control
  • Remote environmental monitoring stations
  • Mining tailings and water management systems
  • Renewable energy site monitoring (wind, solar)
End-to-End Services

From design and specification through factory testing, commissioning, and ongoing maintenance — Candron delivers at every phase.

  • Engineering drawings and coordination studies
  • Factory acceptance testing (FAT) with full reports
  • Site commissioning and protection settings
  • Spare parts, training, and maintenance support
FAQ

Common Questions

We support all major industrial communication protocols including Modbus RTU/TCP, DNP3, IEC 60870-5-101/104, OPC-UA, Profinet, EtherNet/IP, and BACnet. We select the protocol based on your SCADA host software and existing infrastructure.

Yes — we build Class I, Division 2 (Zone 2) panels per CSA C22.2 No. 213. For Zone 1 or Division 1 applications, we can supply panels with Ex-rated enclosures and intrinsically safe barriers for all field connections.

We integrate a UPS module (typically 24 VDC rack-mount) with battery backup sized for 30 minutes to 8 hours depending on the critical alarm monitoring requirement. Solar charging and external battery bank interfaces are also available for off-grid locations.

Get a Quote

Ready to Spec
Your Project?

Our engineering team responds with specs, lead times, and pricing the same day. Tell us what you need:

  • I/O count: number of AI, DI, AO, DO signals
  • Analog signal types: 4–20 mA, RTD, TC, etc.
  • SCADA protocol and host software name
  • Communication medium: Ethernet, cellular, fibre
  • Hazardous area classification (if applicable)
  • Power supply available at site (AC or DC)
Same-Day Response

Send us your project details and we'll respond with a price, lead time, and any clarifying questions — typically within a few hours.

Request a Quote →Or call us directly