Quality Assurance

Comprehensive
Factory Testing

Every system is tested before shipment to verify safety, reliability, and compliance. No equipment leaves our facility without passing a rigorous in-house factory acceptance test.

Why Testing Matters

Tested Equipment.
Trusted Performance.

Field failures cost more than just money — they cost downtime, project delays, safety incidents, and damaged relationships. Comprehensive factory testing is the only reliable way to verify that equipment will perform as designed once it reaches your site.

At Candron Energy, every system undergoes structured factory testing before shipment. Our in-house testing capability means we control the process, maintain the documentation, and can accommodate witnessed FAT for your project team or third-party inspector — without scheduling delays from an external test facility.

Testing is not an add-on at Candron. It is a fundamental part of every project, performed to the same rigorous standards regardless of project size or scope.

Testing Capabilities

What We Test

Every system undergoes structured testing before it leaves our facility. We control the process, maintain full documentation, and can accommodate witnessed FAT for your team or third-party inspector.

Request a Witnessed FAT →
01
Functional Testing

Verification of all control circuits, protection functions, interlocks, and operational sequences against the approved design documentation.

02
Protection Verification

Testing of all protection relay functions, overcurrent settings, trip timing, and alarm functions to confirm correct operation.

03
Control Logic Testing

PLC program verification, HMI functionality testing, and sequence of operations validation against the approved control philosophy.

04
Equipment Validation

Physical inspection and verification of all components, ratings, labels, and documentation against project specifications and applicable standards.

05
Factory Acceptance Testing

Comprehensive witnessed or unwitnessed FAT performed to applicable ANSI, IEEE, NETA, CSA, and UL requirements with full test reports.

06
Documentation Review

Complete review of as-built drawings, test records, equipment data sheets, and O&M manuals against project requirements before shipment.

Factory Testing
Witnessed FAT Available

Your Team Can
Be Present

Candron accommodates witnessed factory acceptance tests for project owners, engineers of record, and third-party inspectors. Schedule your FAT visit during project kickoff to align with your timeline.

Schedule a Visit →
Standards & Compliance

Built to the Highest Standards

Candron's testing programs are aligned with applicable national and international standards governing power distribution equipment.

ANSI
ANSI
American National Standards Institute requirements for electrical equipment
IEEE
IEEE
Institute of Electrical and Electronics Engineers testing standards
NETA
NETA
InterNational Electrical Testing Association acceptance testing specifications
CSA Group
CSA
Canadian Standards Association — full compliance for Canadian projects
UL Solutions
UL
Underwriters Laboratories listing and certification requirements
The Advantage

Why In-House Testing
Makes a Difference

No Scheduling Delays
In-house testing means no waiting for an external test lab. Your FAT is scheduled to align with your project timeline — not an external facility's availability.
Issues Resolved Immediately
When testing identifies an issue, our engineering and assembly team is on-site to resolve it immediately. No shipping equipment back and forth between facilities.
Complete Documentation
Detailed test reports generated and reviewed internally before delivery. Full traceability from test results to as-built drawings and equipment data sheets.

Every Unit Tested Before It Ships

Quality you can verify. Request a quote and ask about witnessed FAT availability for your project.