Comprehensive
Factory Testing
Every system is tested before shipment to verify safety, reliability, and compliance. No equipment leaves our facility without passing a rigorous in-house factory acceptance test.
Tested Equipment.
Trusted Performance.
Field failures cost more than just money — they cost downtime, project delays, safety incidents, and damaged relationships. Comprehensive factory testing is the only reliable way to verify that equipment will perform as designed once it reaches your site.
At Candron Energy, every system undergoes structured factory testing before shipment. Our in-house testing capability means we control the process, maintain the documentation, and can accommodate witnessed FAT for your project team or third-party inspector — without scheduling delays from an external test facility.
Testing is not an add-on at Candron. It is a fundamental part of every project, performed to the same rigorous standards regardless of project size or scope.
What We Test
Every system undergoes structured testing before it leaves our facility. We control the process, maintain full documentation, and can accommodate witnessed FAT for your team or third-party inspector.
Request a Witnessed FAT →Verification of all control circuits, protection functions, interlocks, and operational sequences against the approved design documentation.
Testing of all protection relay functions, overcurrent settings, trip timing, and alarm functions to confirm correct operation.
PLC program verification, HMI functionality testing, and sequence of operations validation against the approved control philosophy.
Physical inspection and verification of all components, ratings, labels, and documentation against project specifications and applicable standards.
Comprehensive witnessed or unwitnessed FAT performed to applicable ANSI, IEEE, NETA, CSA, and UL requirements with full test reports.
Complete review of as-built drawings, test records, equipment data sheets, and O&M manuals against project requirements before shipment.

Your Team Can
Be Present
Candron accommodates witnessed factory acceptance tests for project owners, engineers of record, and third-party inspectors. Schedule your FAT visit during project kickoff to align with your timeline.
Schedule a Visit →Built to the Highest Standards
Candron's testing programs are aligned with applicable national and international standards governing power distribution equipment.




Why In-House Testing
Makes a Difference
Every Unit Tested Before It Ships
Quality you can verify. Request a quote and ask about witnessed FAT availability for your project.