Utility-Approved Switchboards
Revenue metering compartments with sealable CT/PT sections and inspection-ready layouts accepted by Ontario utilities. Designed for Alectra, Hydro One, Toronto Hydro, and other LDC requirements.
Revenue Metering to Local Utility Standards
Utility-approved switchboards are designed to meet the exact requirements of local distribution companies (LDCs) — from the physical layout and compartment accessibility to the CT/PT ratio, meter type, and sealability. We coordinate directly with Alectra, Hydro One, Toronto Hydro, and other utilities to ensure approval before delivery.
- Utility-specified CT/PT ratios and metering compartment layout
- Sealable CT/PT compartment with locked covers and viewing window
- Revenue-grade metering: accuracy class 0.2S or better
- Utility inspector access without de-energizing the facility
- Separate metering section from distribution section
- As-built drawings, test reports, and utility submission package

What's Included
- Utility-specified CT/PT section (lockable, sealable)
- Revenue-grade kWh meter — approved model per LDC list
- Sealable viewing window for meter reading
- Utility inspector access clearances per LDC standards
- Main breaker below or above metering section as required
- Separate metering section with lockable utility door
- CT/PT rated for accuracy class per ANSI C12 / IEC 62053
- Nameplates and warning labels per ESA and utility requirements
- Grounding and bonding per local service requirements
- +Demand and interval metering (15-min interval data logging)
- +Advanced metering infrastructure (AMI) compatible meter
- +Optical fiber or cellular communications for remote meter reading
- +Sub-metering sections for multi-tenant billing
- +Power quality monitoring (THD, unbalance, flicker)
- +SCADA gateway for building energy management integration
- +Witnessed factory acceptance testing (FAT)
- +Coordination with utility for pre-energization inspection
Full Specifications
| Parameter | Value |
|---|---|
| Voltage | 120/208 V, 277/480 V, 347/600 V — to utility specification |
| CT Ratio | Per utility specification (e.g., 200:5, 400:5, 800:5) |
| PT Ratio | Per utility specification (e.g., 120:1 or other) |
| Metering Accuracy | Class 0.2S (IEC) or 0.3 (ANSI C12) revenue grade |
| Meter Type | LDC-approved revenue meter (Itron, Landis+Gyr, Elster) |
| Sealability | Padlock provision on CT/PT door and meter cover |
| Utility Access | Lockable compartment with inspector access without trip |
| Bus Material | Copper, silver-plated contacts |
| Standards | UL 891, CSA C22.2, ESA, ANSI C12, utility service requirements |
| Lead Time | 4–8 weeks from utility approval |
Built to Standard



Where It's Used
- Commercial plaza multi-tenant metering
- Industrial campus tenant sub-metering
- Mixed-use development utility points of supply
- New subdivision electrical service entrance
- High-rise condo and apartment utility metering
- Data centre utility interconnection metering
- Renewable energy facility export metering
- Government building utility service point
From design and specification through factory testing, commissioning, and ongoing maintenance — Candron delivers at every phase.
- Engineering drawings and coordination studies
- Factory acceptance testing (FAT) with full reports
- Site commissioning and protection settings
- Spare parts, training, and maintenance support
Common Questions
We request the utility's current service requirements document and design the CT/PT section, metering compartment, and switchboard layout to match exactly. We can also submit drawings for pre-approval by the LDC before manufacturing and arrange a pre-energization inspection at our facility or site.
Yes. The utility CT/PT and meter section is designed with an access door accessible from the utility corridor or exterior, separate from the customer distribution section. The meter reading window allows read without opening any cover.
Utility name, service voltage, maximum demand (kVA), LDC-specified CT/PT ratios, preferred meter type, and any physical access requirements. The utility service requirements document is the definitive reference — we request this directly if needed.
Ready to Spec
Your Project?
Our engineering team responds with specs, lead times, and pricing the same day. Tell us what you need:
- Utility/LDC name and service voltage
- Maximum demand (kVA) for CT sizing
- CT/PT ratios if already specified by utility
- Meter type preferred by LDC
- Single-line diagram showing metering point
- Site address and ESA permit required
Send us your project details and we'll respond with a price, lead time, and any clarifying questions — typically within a few hours.
Request a Quote →Or call us directly